SYH: TSX.V   $0.41 (+1.23%)
OTCQX: SYHBF  $0.29 (+0.50%)
SC1P: FRA   $0.24 (+2.50%)
SYH: TSX.V   $0.41 (+1.23%)
OTCQX: SYHBF  $0.29 (+0.50%)
SC1P: FRA   $0.24 (+2.50%)

Overview

Project Image
Pluto Bay

The Pluto Bay Property consists of four claims covering 13,026 hectares, located approximately 14 km north of the Athabasca Basin, just east of the Snowbird Tectonic Zone. Minimal modern exploration has been undertaken on the property, which is prospective for basement-hosted unconformity-related uranium mineralization.

Learn More
Project Image
Foster

The drill-ready Foster property consists of 26 claims totalling 21,252 hectares, approximately 20 km southeast of Cameco's Key Lake operation and adjoining the southwestern end of Skyharbour's Falcon Project, which is currently optioned to North Shore Uranium.

Learn More
Project Image
Bennett

The Bennett Project comprises three claims totalling 5,933 hectares. Uranium exploration was previously conducted on the property between the late 1960’s and early 1980’s, including airborne EM, magnetics, and radiometrics, radon surveys, prospecting, geological mapping, and lake water and sediment sampling.

Learn More
Project Image
914 & Elevator

The 914 and Elevator Projects now comprise a total of thirteen mineral claims forming two contiguous claim blocks, covering 13,785 hectares. The 914 Project consists of seven contiguous claims totaling 4,031 hectares including four newly staked claims totaling 2,898 hectares. The Elevator Project consists of six contiguous claims totaling 9,754 hectares including four newly staked claims totaling 1,742 hectares. Both projects are located 35 to 55 km south of Cameco’s Key Lake Operation.

Learn More
Project Image
Riou

Riou consists of 8,620 hectares over six claims in the north-central portion of the Athabasca Basin and is underlain by Athabasca Supergroup sandstone and conglomerate.

Learn More
Project Image
Bend

The Bend Project consists of two mineral claims covering 9,114 hectares.

Learn More
Project Image
Hartle

The Hartle Project consists of 10 mineral claims covering 52,518 hectares.

Learn More
Project Image
Compulsion

The Compulsion Project consists of two mineral claims covering 10,451 hectares.

Learn More
Project Image
Brassy

The Brassy Project comprises two claims covering 9,896 hectares. The claims are underlain by the Athabasca Group sandstones, with thicknesses ranging from less than 80 metres to just over 200 metres.

Learn More
Project Image
Regambal

The Regambal Project consists of five mineral claims covering 24,208 hectares.

Learn More
Project Image
Orr

The Orr project comprises one claim totalling 5,987 ha located in the northern Athabasca Basin, approximately 46 km southeast of the community of Black Lake.

Learn More
Project Image
Otter

The Otter Project consists of one claim totalling 4,838 ha located in the northern Athabasca Basin approximately 41 km southeast of the community of Black Lake.

Learn More
Project Image
Pendleton

The Pendleton Project consists of four non-contiguous mineral claims totalling 5,338 ha including one recently staked claim totalling 1,448 ha, and is located approximately 70 km southeast of Cameco’s Key Lake Operation and 114 km northwest of the community of Southend.

Learn More
Project Image
Yurchison

The Yurchison Project has been expanded through the staking of 16 additional mineral claims totaling 16,966 hectares, increasing the project’s total land package to 35,029 hectares.

Learn More
Project Image
Haultain

The Haultain Project comprises five newly staked claims totalling 6,607 hectares, located approximately 46 km southwest of Cameco’s Key Lake Operation and 3 km west of Highway 914.

Learn More
Project Image
Bonville

The Bonville Project consists of a single newly staked claim totalling 1,497 ha and is located approximately 60 km south of Cameco’s Key Lake Operation. The Bonville project is located in the Wollaston Domain outside of the currently mapped extent of the Athabasca Basin and mapping indicates the property is underlain by predominantly Wollaston Supergroup metasedimentary gneisses, including prospective locally graphitic lower Wollaston Supergroup pelitic gneisses.

Learn More
Project Image
Bolt Extension

The Bolt Extension Project comprises four newly staked claims adjacent to Skyharbour’s Bolt Project, currently under option to UraEx Resources. Mapping conducted in the 1970’s and 1980’s shows a north-south-trending, anastomosing package of amphibole gneisses surrounded by felsic gneisses, metamorphosed to granulite or upper amphibolite grade.

Learn More
Project Image
South Preston

The South Preston Project consists of one claim totalling 965 hectares, located approximately 30 km south of the Athabasca Basin and adjacent to Skyharbour and Orano Canada’s Preston Joint Venture.

Learn More
Project Image
Rover

The newly staked Rover Project consists of a single claim totalling approximately 792 hectares located approximately 40 kilometres east of Cameco’s McArthur River Mine, 31 kilometers southeast of Cigar Lake Mine, and 68 kilometers west of the community of Wollaston Lake.

Learn More
Project Image
Tarku

The Tarku Project consists of three claims, totalling 8,262 ha, including one newly staked claim covering 2,384 ha, and is located adjacent to Skyharbour’s South Dufferin Project, which is currently under option to UraEx Resources.

Learn More
Project Image
East Dufferin

The East Dufferin Project consists of a single newly staked claim totalling 1,450 ha and is located immediately south of the southern margin of the Athabasca Basin in northern Saskatchewan, approximately 4 km west of Skyharbour’s South Dufferin project, which is currently under option to UraEx Resources.

Learn More
Project Image
Carter North

The newly staked Carter North Project consists of 10 mineral claims, nine of which are contiguous, with one standalone claim, totaling 36,393 hectares.

Learn More
Project Image
Brustad

The Brustad project consists of one newly staked mineral claim totaling 791 hectares, located approximately 21 km east of Skyharbour’s South Dufferin property.

Learn More
Project Image
South Bay

Skyharbour holds a 100% interest in the 84 hectares South Bay Project consisting of six claims around the past-producing Selco South Bay copper-zinc-silver mine.

Learn More

Latest News

All News