The drill-ready Foster property consists of 26 claims totalling 21,252 hectares, approximately 20 km southeast of Cameco's Key Lake operation and adjoining the southwestern end of Skyharbour's Falcon Project, which is currently optioned to North Shore Uranium.
Learn More
Skyharbour has staked five additional claims totalling 12,624.1 hectares at its Bennett Project, increasing the property to seven claims totalling 17,657.1 hectares.
Learn More
The 914 and Elevator Projects now comprise a total of thirteen mineral claims forming two contiguous claim blocks, covering 13,785 hectares. The 914 Project consists of seven contiguous claims totaling 4,031 hectares including four newly staked claims totaling 2,898 hectares. The Elevator Project consists of six contiguous claims totaling 9,754 hectares including four newly staked claims totaling 1,742 hectares. Both projects are located 35 to 55 km south of Cameco’s Key Lake Operation.
Learn More
The Orr project comprises one claim totalling 5,987 ha located in the northern Athabasca Basin, approximately 46 km southeast of the community of Black Lake.
Learn More
The Otter Project consists of one claim totalling 4,838 ha located in the northern Athabasca Basin approximately 41 km southeast of the community of Black Lake.
Learn More
The Pendleton Project consists of four non-contiguous mineral claims totalling 5,338 ha including one recently staked claim totalling 1,448 ha, and is located approximately 70 km southeast of Cameco’s Key Lake Operation and 114 km northwest of the community of Southend.
Learn More
The Yurchison Project has been expanded through the staking of 16 additional mineral claims totaling 16,966 hectares, increasing the project’s total land package to 35,029 hectares.
Learn More
The Haultain Project comprises five newly staked claims totalling 6,607 hectares, located approximately 46 km southwest of Cameco’s Key Lake Operation and 3 km west of Highway 914.
Learn More
The Bonville Project consists of a single newly staked claim totalling 1,497 ha and is located approximately 60 km south of Cameco’s Key Lake Operation. The Bonville project is located in the Wollaston Domain outside of the currently mapped extent of the Athabasca Basin and mapping indicates the property is underlain by predominantly Wollaston Supergroup metasedimentary gneisses, including prospective locally graphitic lower Wollaston Supergroup pelitic gneisses.
Learn More
The South Preston Project consists of one claim totalling 965 hectares, located approximately 30 km south of the Athabasca Basin and adjacent to Skyharbour and Orano Canada’s Preston Joint Venture.
Learn More
The newly staked Rover Project consists of a single claim totalling approximately 792 hectares located approximately 40 kilometres east of Cameco’s McArthur River Mine, 31 kilometers southeast of Cigar Lake Mine, and 68 kilometers west of the community of Wollaston Lake.
Learn More
The Tarku Project consists of three claims, totalling 8,262 ha, including one newly staked claim covering 2,384 ha, and is located adjacent to Skyharbour’s South Dufferin Project, which is currently under option to UraEx Resources.
Learn More
The East Dufferin Project consists of a single newly staked claim totalling 1,450 ha and is located immediately south of the southern margin of the Athabasca Basin in northern Saskatchewan, approximately 4 km west of Skyharbour’s South Dufferin project, which is currently under option to UraEx Resources.
Learn More
The newly staked Carter North Project consists of 10 mineral claims, nine of which are contiguous, with one standalone claim, totaling 36,393 hectares.
Learn More
The Brustad project consists of one newly staked mineral claim totaling 791 hectares, located approximately 21 km east of Skyharbour’s South Dufferin property.
Learn More
The Carswell East Project consists of four claims totalling 19,786.0 hectares in the western Athabasca Basin, approximately 9 km east of the former Cluff Lake uranium mine complex and Highway 955, 197 km north of La Loche, and 216 km northeast of Fort McMurray.
Learn More
The Carswell North Project consists of a single claim totalling 1,544.2 hectares in the western Athabasca Basin, approximately 28 km northeast of the former Cluff Lake mine complex, 260 km northeast of Fort McMurray, and 230 km north of La Loche.
Learn More
Skyharbour has staked two additional claims totalling 6,349.5 hectares at its Carter North Project, increasing the property to twelve claims totalling 42,742 hectares.
Learn More
The Carter West Project comprises six mineral claims totaling 24,397.9 hectares along the western margin of the Athabasca Basin, approximately 24 km northeast of the Athabasca Basin boundary.
Learn More
The Cree North Project consists of seven contiguous claims totalling 30,203.9 hectares.
Learn More
Skyharbour has staked one additional claim totalling 4,696.1 hectares at its Elevator Project, increasing the property to seven claims totalling 14,449.9 hectares.
Learn More
Ford Lake consists of three claims in the southeastern Athabasca Basin totaling 4,920.5 hectares, including two contiguous claims and one claim located approximately 7 km southwest of the northern claims.
Learn More
Skyharbour has reacquired the historic three-claim Iris property and merged it with the four-claim Bolt Extension property to form the new Iris Project, which now totals seven claims covering 5,707.8 hectares.
Learn More
The LEB Project consists of two mineral claims totaling 607.4 hectares along the southern margin of the Athabasca Basin, approximately 60 kilometres west of the Key Lake Mine and Mill.
Learn More
The Perpete Project comprises a single claim totaling 350.5 hectares within the southeastern Athabasca Basin.
Learn More
The Pine Project consists of seven mineral claims totaling 23,816.9 hectares located along the northern margin of the Athabasca Basin.
Learn More
The Rapids Project consists of four non-contiguous mineral claims totalling 15,561.2 hectares in northern Saskatchewan.
Learn More
Skyharbour holds a 100% interest in the 84 hectares South Bay Project consisting of six claims around the past-producing Selco South Bay copper-zinc-silver mine.
Learn More
