The Preston Project is a large 49,635 hectare (122,651 acre) land position strategically located to the south of and adjacent to NexGen Energy's (TSX: NXE) Rook 1 project host to the high grade Arrow deposit, as well as proximal to Fission Uranium’s (TSX: FCU) Patterson Lake South (“PLS”) project host to the high grade Triple R deposit. Orano Canada is a 51% JV partner at the Preston Project (Skyharbour owns 24.5%).
The East Preston Project is a Large 20,674 hectare (51,080 acre) land position strategically located to the south of NexGen Energy's (TSX: NXE) Rook 1 project host to the high grade Arrow deposit, as well as proximal to Fission Uranium’s (TSX: FCU) Patterson Lake South (“PLS”) project host to the high grade Triple R deposit. Azincourt Energy is an 86% JV partner at the East Preston Project (Skyharbour owns 9.5%).
The Hook Lake project consists of 16 contiguous mineral claims totalling 25,847 hectares. The project area is in close proximity to two all-weather northern highways and grid power. Historical exploration has consisted of airborne and ground geophysics, multi-phased diamond drill campaigns, detailed geochemical sampling and surveys, and ground-based prospecting culminating in an extensive geological database for the project area. Thunderbird Resources Limited (previously Valor) is an 80% JV partner at the Hook Lake Project (Skyharbour owns 20%).
Skyharbour owns 100% of the Falcon (previously Way Lake) Uranium Project which covers 42,908 hectares covering 11 claims approximately 50 km east of the Key Lake mine. Uranium mineralization discovered to date at Falcon is shallow and is hosted in two geological settings, with the southern half hosting classic Athabasca-style basement mineralization associated with well-developed EM conductors which include EWA and Walker targets. North Shore Uranium Ltd. is an earn-in option partner up to 100% at the Falcon Project.
The South Falcon East Project is located in the southeast Athabasca Basin and represents a portion of Skyharbour’s larger South Falcon Project. The project covers approximately 12,234 hectares and lies 18 kilometers outside the Athabasca Basin, approximately 55 kilometers east of the Key Lake Mine. Terra Clean Energy (previously Tisdale) is an earn-in option partner up to 75% at the South Falcon East Project.
The 3,473 hectare (8,582 acre) Mann Lake Uranium Project is located in the eastern Athabasca Basin in northern Saskatchewan. It is strategically located 25 km southwest of the McArthur River Mine, the largest high-grade uranium deposit in the world, and 15 km to the northeast along strike of Cameco's Millennium uranium deposit. Basin Uranium Corp. is an earn-in option partner up to 75% at the Mann Lake Project.
The Yurchison Project consists of 13 claims totalling 57,407 ha in the Wollaston Domain of northern Saskatchewan, Canada. This contiguous set of claims covers an extensive package of Wollaston Supergroup metasediments in an area known for its base metal potential. Medaro Mining Corp. is an earn-in option partner up to 100% at the Yurchison Project.
The South Dufferin Project totals 13,205 hectares covering 10 claims and is located immediately south of the southern margin of the Athabasca Basin in northern Saskatchewan. The property covers the southern extension of the Virgin River Shear Zone, which hosts known high-grade uranium mineralization at Cameco Corp.'s Dufferin Lake zone approximately 13 kilometres to the north (highlight drill results of 1.73% U3O8 over 6.5 metres) and Cameco Corp.'s Centennial deposit approximately 25 kilometres to the north (includes drill intersections up to 8.78% U3O8 over 33.9 metres). UraEx Resources is an earn-in option partner up to 100% at the South Dufferin Project.
The Bolt Project consists of two contiguous claims 100% owned by Skyharbour Resources Ltd. totalling 4,726 hectares and is located approximately 7 km west of the Highway 914 and about 32 km southwest of Cameco’s Key Lake Operation (which produced 209.8 million pounds of U3O8 at an average grade of 2.32% U3O8 from 2 deposits, where ore from the McArthur River mine is currently processed). UraEx Resources is an earn-in option partner up to 100% at the Bolt Project.
The Highway Project consists of four claims covering 9,339 hectares, approximately 41 km south of the Rabbit Lake Mine and 11 km SW of Uranium Energy Corp.’s (UEC, formerly UEX) West Bear U and Co-Ni Deposits. Highway 905 runs through the property, providing excellent access for exploration and the project is in close proximity to regional infrastructure. Despite its proximity to infrastructure and excellent access, the project is relatively underexplored. Hatchet Uranium Corp. is an earn-in option partner up to 80% at the Highway Project.
The Genie property consists of five claims totalling 16,930 ha, and is located approximately 48 km northeast of Cameco’s Eagle Point Uranium Mine (Rabbit Lake Operation) and 40 km north of Wollaston Lake Post.
The Usam Project consists of 12 claims totalling 40,041 hectares and is located approximately 16 km northeast of Cameco’s Eagle Point Mine (Rabbit Lake Operation).
The CBX and Shoe projects consist of eight non-contiguous claims totalling 9,386 hectares and lies approximately 6.5 km to 25 km north to northeast of the Eagle Point uranium mine and cover the northern shore of Wollaston Lake including parts of Cunning Bay.