SYH: TSX.V   $0.45 (-1.11%)
OTCQX: SYHBF  $0.33 (+1.65%)
SC1P: FRA   $0.26 (-2.20%)
SYH: TSX.V   $0.45 (-1.11%)
OTCQX: SYHBF  $0.33 (+1.65%)
SC1P: FRA   $0.26 (-2.20%)

Shareholder Updates

Shareholder Update

Nov 18, 2016

Skyharbour CEO Jordan Trimble’s Interview with Curzio Research Discussing the Uranium Industry, Current Project Base and the Upcoming Drill Program

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH) (OTC Grey: SYHBF) (Frankfurt: SC1N) (the “Company”) is pleased to share a recent interview CEO Jordan Trimble did with Frank Curzio from Curzio Reaseach to discuss the current and future state of the uranium industy, the Company’s project base and the upcoming drill program at the flagship Moore Lake Uranium Project in the Athabasca Basin of Sasketchewan.

You can listen to the full interview on Curzio Reasearch here with Jordan’s interview beginning at 13:25 and ending at 47:00:

http://www.frankcurzio.com/insider-look-into-the-2016-silver-and-gold-summit/

For the MP3 file, click here:

http://traffic.libsyn.com/sainvestorradio/WSU20EP20468.mp3

Upcoming Drill Program:

The Company is on schedule to commence its previously announced drill program on its flagship property, Moore Lake, in January 2017 with additional news forthcoming on the program. Skyharbour recently secured an option from Denison Mines (TSX: DML), a large shareholder of the Company, to acquire a 100% interest in the Moore Lake Uranium Project which hosts the high grade Maverick Zone where previous drilling returned 4.03% U3O8 over 10 metres at 265 metres depth. In addition to the Maverick Zone, the project hosts other mineralized targets with strong discovery potential which the Company plans to test in the upcoming drill program.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with five drill-ready projects. In July 2016, Skyharbour acquired an option from Denison Mines to acquire 100% of the Moore Lake Uranium Project which is located 20 kilometres east of Denison’s Wheeler River project and 39 kilometres south of Cameco’s McArthur River mine. Moore Lake is an advanced stage uranium exploration property with over $30 million in historical exploration, 370 diamond drill holes, and a high-grade uranium zone known as the Maverick Zone with drill results including 4.03% eU3O8 over 10 metres at a vertical  depth of 265 metres. The Company owns a 100% interest in the Falcon Point (formerly Way Lake) Uranium Project on the eastern perimeter of the Basin which hosts an NI 43-101 inferred resource totaling 7.0 million pounds of U3O8 at 0.03% and 5.3 million pounds of ThO2 at 0.023%. The project also hosts a high grade surface showing with up to 68% U3O8 in grab samples from a massive pitchblende vein, the source of which has yet to be discovered. Skyharbour also has a 50% interest in the large, geologically prospective Preston Uranium Project proximal to Fission Uranium’s Triple R deposit as well as NexGen Energy’s Arrow deposit. The Company’s 100% owned Mann Lake Uranium project on the east side of the Basin is strategically located adjacent to the Mann Lake Joint Venture operated by Cameco with partners Denison Mines and AREVA, where high-grade uranium mineralization was recently discovered. Skyharbour’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”
                                                           
Jordan Trimble
President and CEO

For further information contact myself or:
Nick Findler
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3850
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS UPDATE.

Latest News

All News