SYH: TSX.V   $0.37 (+15.63%)
OTCQX: SYHBF  $0.25 (+9.36%)
SC1P: FRA   $0.21 (0.00%)
SYH: TSX.V   $0.37 (+15.63%)
OTCQX: SYHBF  $0.25 (+9.36%)
SC1P: FRA   $0.21 (0.00%)

Projects For Option

Projects for option

Projects Available for Option:

Pluto Bay

The Pluto Bay Property consists of four claims covering 13,026 hectares, located approximately 14 km north of the Athabasca Basin, just east of the Snowbird Tectonic Zone. Minimal modern exploration has been undertaken on the property, which is prospective for basement-hosted unconformity-related uranium mineralization.

Foster

The drill-ready Foster property consists of 15 claims totaling 6,362 hectares approximately 20 km east of Cameco's Key Lake operation and adjoining the southwestern end of Skyharbour's Falcon Project, currently optioned out to North Shore Energy Metals Ltd.

South Bay

Skyharbour holds a 100% interest in the 84 hectares South Bay Project consisting of 6 claims around the past-producing Selco South Bay copper-zinc-silver mine.

Karin

The Karin Project consists of five claims covering 19,116 hectares approximately 20 km south-southeast of Cameco's Key Lake operation.

914, 914N, and Elevator

The 914, 914N, and Elevator projects consist of four non-contiguous claims totalling 11,873 hectares and are located 31 to 52 km south of the Athabasca Basin margin and 35 to 55 km south of Cameco’s Key Lake Operation (209.8 million pounds U3O8 produced at an average grade of 2.32%).

Riou

Riou consists of 8,620 hectares over six claims in the north-central portion of the Athabasca Basin and is underlain by Athabasca Supergroup sandstone and conglomerate.

Bend Project

The Bend Project consists of two mineral claims covering 9,114 hectares.

Compulsion Project

The Compulsion Project consists of two mineral claims covering 10,451 hectares.

Hartle Project

The Hartle Project consists of 10 mineral claims covering 52,518 hectares.

Regambal Project

The Regambal Project consists of five mineral claims covering 24,208 hectares.

Brassy Project

The Brassy Project consists of two mineral claims covering 9,896 hectares.

Contact Jordan Trimble or Andrew Ramcharan for more details: jtrimble@sentinelmarket.com | aramcharan@sentinelmarket.com 

Latest News

All News