Project Summary:
The Spence Project comprises five non-contiguous claims totalling 14,334 hectares, including two newly staked claims covering 11,915 ha. Located 75 to 85 km south of Cameco’s Rabbit Lake Operation, the project is easily accessible via Highway 905, which runs within 1 km of the westernmost claims and nearby infrastructure, including fuel and lodging at km 147. The project is underlain by Wollaston Supergroup metasedimentary gneisses, including graphitic pelitic units adjacent to Archean granites within the Eastern Wollaston Domain, which is a setting highly prospective for unconformity-related uranium mineralization in the Athabasca Basin.
Historical work on the property (1960’s–1990’s) focused on SEDEX-style Pb-Zn mineralization, targeting extensions of the adjacent George Lake deposit, and included airborne and ground geophysics, mapping, and geochemistry. More recently, VTEM, VLF-EM, magnetics, and radiometrics were flown in 2022–2023. Despite this, modern uranium-focused exploration has been limited. The property hosts several untested targets prospective for both unconformity-related basement-hosted uranium and SEDEX-style Pb-Zn mineralization.
*Please contact Aramcharan@sentinelmarket.com for additional information regarding the project available for option.