SYH: TSX.V   $0.38 (+4.17%)
OTCQX: SYHBF  $0.26 (+2.34%)
SC1P: FRA   $0.24 (0.00%)
SYH: TSX.V   $0.38 (+4.17%)
OTCQX: SYHBF  $0.26 (+2.34%)
SC1P: FRA   $0.24 (0.00%)

Overview

Figure 1

Projects Available for Option:

Pluto Bay

The Pluto Bay Property consists of four claims covering 13,026 hectares, located approximately 14 km north of the Athabasca Basin, just east of the Snowbird Tectonic Zone. Minimal modern exploration has been undertaken on the property, which is prospective for basement-hosted unconformity-related uranium mineralization.

Foster

The drill-ready Foster property now consists of 26 claims totaling 21,252 hectares approximately 20 km east of Cameco's Key Lake operation and adjoining the southwestern end of Skyharbour's Falcon Project, currently optioned out to North Shore Uranium Ltd. 

South Bay

Skyharbour holds a 100% interest in the 84 hectares South Bay Project consisting of 6 claims around the past-producing Selco South Bay copper-zinc-silver mine.

Bennet

The Bennet Project consists of five claims covering 19,116 hectares approximately 20 km south-southeast of Cameco's Key Lake operation.

914, 914N, and Elevator

The 914, 914N, and Elevator projects consist of four non-contiguous claims totalling 11,873 hectares and are located 31 to 52 km south of the Athabasca Basin margin and 35 to 55 km south of Cameco’s Key Lake Operation (209.8 million pounds U3O8 produced at an average grade of 2.32%).

Riou

Riou consists of 8,620 hectares over six claims in the north-central portion of the Athabasca Basin and is underlain by Athabasca Supergroup sandstone and conglomerate.

Bend Project

The Bend Project consists of two mineral claims covering 9,114 hectares.

Compulsion Project

The Compulsion Project consists of two mineral claims covering 10,451 hectares.

Hartle Project

The Hartle Project consists of 10 mineral claims covering 52,518 hectares.

Regambal Project

The Regambal Project consists of five mineral claims covering 24,208 hectares.

Brassy Project

The Brassy Project consists of two mineral claims covering 9,896 hectares.

Horton Project

The recently acquired Horton project consists of 3 claims totalling 2,922 ha, located approximately 34 km south of Cameco’s Rabbit Lake Operation, and 40 km southwest of the community of Wollaston Lake.

Lynx Project

The Lynx property was recently acquired through staking and consists of two new claims totalling 5,345 ha located approximately 54 km south of Cameco’s Rabbit Lake Operation, with Highway 905 running along the eastern edge of the one claim, providing year-round easy access to the property.

Orr Project

The Orr project consists of one claim totalling 5,987 ha located in the northern Athabasca Basin approximately 46 km southeast of the community of Black Lake.

Otter Project

The Otter Project consists of one claim totalling 4,838 ha located in the northern Athabasca Basin approximately 41 km southeast of the community of Black Lake.

Pendleton Project

The Pendleton Project consists of three newly acquired mineral claims totalling 3,890 ha located approximately 70 km southeast of Cameco’s Key Lake Operation and 114 km northwest of the community of Southend.

Snowbird Project

The Snowbird project consists of 16 new claims totalling 29,712 ha and is located about 35 km south of Cameco’s Centennial Deposit along the Virgin River Shear Zone.

Spence Project

The recently staked Spence property consists of 3 non-contiguous claims totalling 2,419 ha and is located approximately 75 to 85 km south of Cameco’s Rabbit Lake operation, with Highway 905 located within 1 km of the westernmost claims.

Yurchison Project

The Yurchison Project consists of 7 claims totalling 20,440 ha in the Wollaston Domain of northern Saskatchewan, Canada.

Contact Jordan Trimble or Andrew Ramcharan for more details: jtrimble@sentinelmarket.com | aramcharan@sentinelmarket.com

Latest News

All News