Projects Available for Option:
The Pluto Bay Property consists of four claims covering 13,026 hectares, located approximately 14 km north of the Athabasca Basin, just east of the Snowbird Tectonic Zone. Minimal modern exploration has been undertaken on the property, which is prospective for basement-hosted unconformity-related uranium mineralization.
The drill-ready Foster property consists of 26 claims totalling 21,252 hectares, approximately 20 km southeast of Cameco's Key Lake operation and adjoining the southwestern end of Skyharbour's Falcon Project, which is currently optioned to North Shore Uranium.
Skyharbour holds a 100% interest in the 84 hectares South Bay Project consisting of 6 claims around the past-producing Selco South Bay copper-zinc-silver mine.
The Bennett Project comprises four claims totalling 11,815 hectares, including two newly re-staked claims covering 5,033 hectares, located in the Highrock Lake area.
The 914 and Elevator Projects now comprise a total of thirteen mineral claims forming two contiguous claim blocks, covering 13,785 hectares. The 914 Project consists of seven contiguous claims totaling 4,031 hectares including four newly staked claims totaling 2,898 hectares. The Elevator Project consists of six contiguous claims totaling 9,754 hectares including four newly staked claims totaling 1,742 hectares. Both projects are located 35 to 55 km south of Cameco’s Key Lake Operation.
Riou consists of 8,620 hectares over six claims in the north-central portion of the Athabasca Basin and is underlain by Athabasca Supergroup sandstone and conglomerate.
The Bend Project consists of two mineral claims covering 9,114 hectares.
The Compulsion Project consists of two mineral claims covering 10,451 hectares.
The Hartle Project consists of 10 mineral claims covering 52,518 hectares.
The Regambal Project consists of five mineral claims covering 24,208 hectares.
The Brassy Project comprises two claims covering 9,896 hectares. The claims are underlain by the Athabasca Group sandstones, with thicknesses ranging from less than 80 metres to just over 200 metres.
The Orr project comprises one claim totalling 5,987 ha located in the northern Athabasca Basin, approximately 46 km southeast of the community of Black Lake.
The Otter Project consists of one claim totalling 4,838 ha located in the northern Athabasca Basin approximately 41 km southeast of the community of Black Lake.
The Pendleton Project consists of four non-contiguous mineral claims totalling 5,338 ha including one recently staked claim totalling 1,448 ha, and is located approximately 70 km southeast of Cameco’s Key Lake Operation and 114 km northwest of the community of Southend.
The Yurchison Project has been expanded through the staking of sixteen additional mineral claims totaling 16,966 hectares, increasing the project’s total land package to 35,029 hectares.
The Haultain Project comprises five newly staked claims totalling 6,607 hectares, located approximately 46 km southwest of Cameco’s Key Lake Operation and 3 km west of Highway 914.
The Bonville Project consists of a single newly staked claim totalling 1,497 ha and is located approximately 60 km south of Cameco’s Key Lake Operation. The Bonville project is located in the Wollaston Domain outside of the currently mapped extent of the Athabasca Basin and mapping indicates the property is underlain by predominantly Wollaston Supergroup metasedimentary gneisses, including prospective locally graphitic lower Wollaston Supergroup pelitic gneisses.
The Bolt Extension Project comprises four newly staked claims adjacent to Skyharbour’s Bolt Project, currently under option to UraEx Resources. Mapping conducted in the 1970’s and 1980’s shows a north-south-trending, anastomosing package of amphibole gneisses surrounded by felsic gneisses, metamorphosed to granulite or upper amphibolite grade.
The South Preston Project consists of one claim totalling 965 hectares, located approximately 30 km south of the Athabasca Basin and adjacent to Skyharbour and Orano Canada’s Preston Joint Venture.
The Tarku Project consists of three claims, totalling 8,262 ha, including one newly staked claim covering 2,384 ha, and is located adjacent to Skyharbour’s South Dufferin Project, which is currently under option to UraEx Resources.
The newly staked Rover Project consists of a single claim totalling approximately 792 hectares located approximately 40 kilometres east of Cameco’s McArthur River Mine, 31 kilometers southeast of Cigar Lake Mine, and 68 kilometers west of the community of Wollaston Lake.
The East Dufferin Project consists of a single newly staked claim totalling 1,450 ha and is located immediately south of the southern margin of the Athabasca Basin in northern Saskatchewan, approximately 4 km west of Skyharbour’s South Dufferin project, which is currently under option to UraEx Resources.
The newly staked Carter North Project consists of 10 mineral claims, nine of which are contiguous, with one standalone claim, totaling 36,393 hectares.
The Brustad project consists of one newly staked mineral claim totaling 791 hectares, located approximately 21 km east of Skyharbour’s South Dufferin property.
Contact Nicholas Coltura for more details: ncoltura@sentinelmarket.com


