Update To The Shareholders

Skyharbour Invites Investor Community to the Silver and Gold Summit in San Francisco November 14th and 15th; Recent Video Interview with CEO Jordan Trimble

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH) (OTC Grey: SYHBF) (Frankfurt: SC1N) (the “Company”) will be attending Cambridge House’s “The Silver & Gold Summit” in partnership with Katusa Research on November 14th and 15th at the Park Central Hotel in San Francisco. Skyharbour will be providing a corporate presentation on Monday November the 14th at 2:30pm. Skyharbour would like to invite the investment community to attend the conference and come see management at booth #300.

Register here:
https://cambridgehouse.com/event/53/the-silver-and-gold-summit-2016

Skyharbour in the Media:

CEO Jordan Trimble recently did an interview with Gerardo Del Real from the Outsider Club and gives an overview of the Company and highlights some of the upcoming catalysts including a winter drill program at the flagship Moore Lake uranium project:

http://www.outsiderclub.com/videos/skyharbour-resources-ceo-jordan-trimble-on-putting-together-a-package-of-athabasca-uranium-assets-a-top-geology-and-management-team/307

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with five drill-ready projects. In July 2016, Skyharbour acquired an option from Denison Mines to acquire 100% of the Moore Lake Uranium Project which is located 20 kilometres east of Denison’s Wheeler River project and 39 kilometres south of Cameco’s McArthur River mine. Moore Lake is an advanced stage uranium exploration property with over $30 million in historical exploration, 370 diamond drill holes, and a high-grade uranium zone known as the Maverick Zone with drill results including 4.03% eU3O8 over 10 metres at a vertical  depth of 265 metres. The Company owns a 100% interest in the Falcon Point (formerly Way Lake) Uranium Project on the eastern perimeter of the Basin which hosts an NI 43-101 inferred resource totaling 7.0 million pounds of U3O8 at 0.03% and 5.3 million pounds of ThO2 at 0.023%. The project also hosts a high grade surface showing with up to 68% U3O8 in grab samples from a massive pitchblende vein, the source of which has yet to be discovered. Skyharbour also has a 50% interest in the large, geologically prospective Preston Uranium Project proximal to Fission Uranium’s Triple R deposit as well as NexGen Energy’s Arrow deposit. The Company’s 100% owned Mann Lake Uranium project on the east side of the Basin is strategically located adjacent to the Mann Lake Joint Venture operated by Cameco with partners Denison Mines and AREVA, where high-grade uranium mineralization was recently discovered. Skyharbour’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”
                                                           
Jordan Trimble
President and CEO

For further information contact myself or:
Nick Findler
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3850
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

 

Sign up for the latest news and updates
X